NEET 03/11/2024 (Mon) 03:33 No.826442 del
>>826440
No, all the 100/20 250/25 plans would simply disappear.
>In terms of speed boosts the 100Mbps plan gets the biggest jump in available speed, lifting to 500Mbps downloads and an increase from 20 to 50Mbps in upload speed. The 250/25 plan will move to 750/50 and the fastest or “Ultrafast” NBN plan will go from being an offer between 500 and 1000Mbps down and 50Mbps up, to 750-1000 down and between 50 and 100Mbps uploads.